Tram
Gubacsi út bridge
Budapest · 2021 · Locomotive CEE Kft.
View projectTram

Commissioned by Siemens Zrt., we carried out the overhead line dismantling and reconstruction for the new stop at the Rudas Baths, within a single track closure, in record time over one weekend. Our tasks included replacing the overhead line, dismantling the section insulators before and after the bridge with their pole switches, repainting the poles in the work area and repairing their bases, fitting new wires with their insulators and fixings between the poles, and installing anti-impact protection between the bridge and the overhead line using a product from a foreign manufacturer.